Hotel unavailable
Lido Hotel, Bucharest
If this is your Hotel and you would like to be listed on AsiaRooms.com click here.
Summary
Hotel built in 1930.
Hotel Exterior:
The hotel is an large white building, with 6 floors. The building was constructed in 1930 and underwent renovation between 1993 and 1996.
General Hotel Information:
This is a very good hotel with all modern facilities that can be expected and elegant settings throughout the building. 02/02.
The hotel contains 6 floor(s) accessible with 2 lifts.
View all Bucharest hotels in Romania
Hotel Exterior:
The hotel is an large white building, with 6 floors. The building was constructed in 1930 and underwent renovation between 1993 and 1996.
General Hotel Information:
This is a very good hotel with all modern facilities that can be expected and elegant settings throughout the building. 02/02.
The hotel contains 6 floor(s) accessible with 2 lifts.